Home > Blog, Pakistan Property News > Hafeez for reducing construction period of M-9 project

Hafeez for reducing construction period of M-9 project

January 14th, 2012 admin Leave a comment Go to comments

Post to Twitter

Hafeez for reducing construction period of M-9 project

ISLAMABAD: Federal Minister for Finance Dr Abdul Hafeez Shaikh said on Friday transparency should be ensured in the execution of Karachi-Hyderabad Motorway (M-9). Chairing a meeting to discuss the progress of Karachi-Hyderabad (M-9) he said construction period should be reduced from 30 months to 12 months. The meeting highlighted the importance of this project for the uplift of Sindh province as well as for overall economic prosperity of the country. The meeting was informed this project covers the conversion of existing 4-lane highway into 6-lane through addition of 1-lane at both sides of the road. The project also includes the improvement of existing 2-lanes of the road. The cost of projects is Rs 24.930 million on BOT basis and construction period would be 30 months. In the same way, groundbreaking ceremony will be held by the end of next month

Tag : Karachi-Hyderabad Motorway (M-9), M-9, Abdul Hafeez Shaikh, Finance Minister, Karachi Property News, Hyderabad Property News, Motorway Project,

Share and Enjoy:
  • Print
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google Bookmarks

Post to Twitter

Related Posts:

  1. No comments yet.
You must be logged in to post a comment.

Twitter links powered by Tweet This v1.8.1, a WordPress plugin for Twitter.